What We Do

Services

Everything we build, fix, and maintain, from framing to the final coat of stain.

HomeServices

Everything we take on

Every job below is one we do ourselves across Brandon.

Deck Installation

We build new decks on pressure-treated pine or composite framing, sized and engineered for Florida wind loads. Footings get poured below grade and the ledger board gets flashed before a single joist goes up. We pull the permit and schedule the inspection so the county signs off on the framing before we deck over it.

Deck Repair

Soft spots, bouncy boards, and rot around the ledger are the calls we get most. We pull the bad boards, check the joists underneath for rot or termite damage, and replace what's failed instead of just capping over it. A repair is only as good as what's underneath, so we won't skip that step.

Deck Staining & Sealing

Florida sun bleaches and dries out wood decking fast, and the wrong stain peels within a season. We pressure wash, let the wood dry out fully, then apply a stain and sealer rated for UV and standing water. Most pine decks should have this redone every one to two years to keep the wood from checking and cupping.

Custom Deck Design

Multi-level decks, built-in benches, pergolas, whatever the lot calls for, we draw it out before we build it. We size the joists and footings to the load, not a stock plan, so a hot tub or an outdoor kitchen doesn't overload the frame. You'll see the layout and materials in writing before we start cutting.

Composite Decking Installation

Composite boards don't rot, splinter, or require staining, which matters a lot in Brandon's humidity. We still frame it in pressure-treated lumber underneath, since composite decking has to sit on solid, properly spaced joists to keep from flexing. Brands like Trex and TimberTech expand and contract with heat, so the gaps and fasteners get set for that, not guessed at.

Deck Railing Repair

Loose rail posts and wobbly balusters are usually a sign the post is only screwed to the fascia board, not bolted through the frame. We rebuild the connection so it passes a firm push test, and we keep baluster spacing under four inches so it's safe for kids and pets. A railing that shakes when you lean on it isn't a small fix, it's a structural one.

Pool Deck Construction

Pool decks take a beating from chlorine, wet feet, and constant sun, so board choice and fastener type matter more here than anywhere else in the yard. We use stainless steel fasteners near the water line so you don't get rust streaks bleeding into the boards. Composite or capped PVC decking usually outlasts wood around a pool by a wide margin.

Deck Resurfacing

If the frame underneath is still sound but the boards have cupped, split, or gone gray, resurfacing replaces the decking without rebuilding the structure. We check every joist for rot first, because there's no point putting new boards over a bad frame. It's a faster, cheaper way to get a deck looking new again when the bones are still good.

Screened Porch & Deck Combos

A lot of homeowners want part of the deck open and part screened in to keep the bugs and afternoon rain out. We frame the screen enclosure to tie into the existing deck structure, not just bolt it on the side, so it doesn't rack or pull away over time. Roof tie-ins and screen frame spacing both matter for wind, especially this close to the coast.

Deck Removal & Rebuild

Sometimes the cheapest long-term fix is tearing an old deck down to the footings and starting over, especially with widespread rot or termite damage. We check whether the existing footings can be reused before we price a full rebuild, since that alone can change the cost a lot. Either way, you get a deck built to current code, not whatever code applied when the old one went up.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Brandon, FL

Deck crews cover Brandon and the wider Tampa Bay area for both new builds and repairs.

Brandon, FL
Tampa, FL
St. Petersburg, FL
Clearwater, FL
Lakeland, FL
Largo, FL
Riverview, FL
Plant City, FL
Valrico, FL
Sun City Center, FL
Wesley Chapel, FL
Zephyrhills, FL
Common Questions

Things worth asking

Questions that tend to come up once a deck project is actually underway.

Do I need a permit to build a deck in Florida?
Most deck construction over 30 inches high, or any deck attached to the house, requires a building permit in Florida. Permits typically cover the footing layout, framing, and railing height, with inspections at different stages of the build.
How long does it take to build a deck?
A standard-sized deck, roughly 300 to 400 square feet, usually takes one to two weeks from framing to final boards, weather allowing. Larger multi-level decks or ones needing extensive permitting can take three to four weeks.
Can a deck be built to fit a specific budget?
Deck size, decking material, and railing style can all be adjusted to hit a target budget. Pressure-treated pine costs less upfront than composite, though composite saves money over time on staining and repairs.
Is deck work guaranteed?
Workmanship on framing, footings, and installation is guaranteed for a set period after completion, with the specific terms in the written quote. Manufacturer warranties on decking material, like composite boards, are separate and get passed along at the start of the job.
Who handles day-to-day communication during a deck project?
Communication runs through the same person handling the quote, from the first estimate through the final walkthrough. Questions about schedule changes or material substitutions go straight to that person rather than getting relayed through a crew.
What decking materials are available?
Pressure-treated pine, cedar, composite brands like Trex and TimberTech, and capped PVC decking are all standard options. Framing is almost always pressure-treated lumber regardless of what decking material sits on top.
Can I still use my yard while the deck is being built?
Most of the yard stays usable during construction, though the immediate work area needs to stay clear for safety and material staging. Pets and kids should stay away from the site while concrete footings are curing and while power tools are running.
How should I prepare the yard before deck construction starts?
Clearing furniture, potted plants, and grills away from the work area helps the crew move material without extra delays. Knowing the location of buried sprinkler lines or utilities ahead of time also prevents damage during footing excavation.
What happens if rot or termite damage is found once the old deck is torn off?
Rot or termite damage found once old decking is removed gets flagged before any new lumber goes down, since building over compromised framing just hides the problem. Additional repair costs get discussed and approved before work continues, not added as a surprise on the final bill.
How should a new deck be maintained once it's finished?
Pressure-treated wood decks should be restained every one to two years in Florida's sun and rain, along with a yearly check for loose fasteners or soft boards. Composite decking just requires periodic washing to keep pollen and mildew from staining the surface.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (813) 544-6713